How Long Does It Take to Build a Custom Trade Show Exhibit?
- custom exhibit
- trade show exhibit
Building a custom trade show exhibit is a complex process that involves multiple stages of planning, design and execution. The timeline can vary significantly based on the project's scope, the exhibit's size and complexity and the level of customization required. On average, it takes IGE Group about 8 weeks to create a custom trade show exhibit—2 weeks for planning and 6 weeks for the design.
To help you understand what to expect when building a trade show booth, let's break down the key phases and the typical duration for each.
Initial Consultation and Planning (1-2 Weeks)
The journey begins with an initial consultation where you discuss your goals, budget and ideas with a trade show agency. During this phase, you’ll:- Define your objectives for the exhibit.
- Discuss your brand identity and messaging.
- Set a budget and timeline.
- Review past exhibits and gather inspiration.
Design Concept and Approval (3-6 Weeks)
Once the initial consultation is complete, the design phase begins. This involves:- Developing initial design concepts and sketches.
- Creating 3D renderings to visualize the exhibit.
- Iterating on the design based on your feedback.
- Finalizing the design and getting approval.
Engineering and Fabrication (6-12 Weeks)
After approval of the design, the engineering and fabrication phase starts. This is where the exhibit moves from concept to reality:- Detailed engineering plans and technical drawings are created.
- Materials are sourced, and components are fabricated.
- Custom elements such as lighting, AV equipment and interactive displays are integrated.
Graphics Production (2-4 Weeks)
While the physical structure comes to life, the trade show booth graphics production phase can occur simultaneously. This involves:- Designing and printing high-quality graphics and signage.
- Ensuring that all visual elements align with your brand and messaging.
- Prepping graphics for installation.
Pre-Assembly and Quality Check (1-2 Weeks)
Before shipping the exhibit to the trade show venue, the team conducts a pre-assembly and quality check that includes:- The exhibit is assembled in the workshop to ensure all components fit and function correctly.
- Any adjustments or repairs are made.
- The exhibit is disassembled and packed for shipping.
Shipping and Installation (1-2 Weeks)
The final phase involves shipping the exhibit to the trade show location and installing it:- Logistics are coordinated to ensure timely delivery.
- Professional installers set up the exhibit on-site.
- Final adjustments and inspections ensure everything is perfect.